Back

In-Situ Dowelling

Transalign ISM has carried out dowel holes to H7 tolerance projects in Australia at Olympic Dam, SA and ERA Ranger Mine, NT, and subsequently in Freeport, Indonesia, Minera Esperanza, Atacama Chile, in addition to Aitik, Boulden, Sweden.

Special equipment built to drill, bore and ream dowel holes to H7 tolerance has resulted in projects carried out in various locations around the world.

Dowel pins ranging in size from 63mm through to 200mm are critical to the installation of hi-tensile dowel pins required to hold the position of machines onto their sole plates.

Talk to a Specialist

24 HOUR BREAKDOWN CONTACT
Call +61 (0)418 897 342